2 Observations on GSK Vaccines Unit ’483
FDA has released the Form FDA-483 issued following a 2/19-2/27 inspection at the GSK Vaccines licensed biological drug manufacturing unit in Marburg, Hassia, Germany. The two inspection observations were:
- failure to validate the cleaning procedures for dedicated equipment used in the manufacture of aluminum hydroxide adjuvant to prevent contamination or carry-over when the adjuvant is a component in several of the company’s licensed U. S. products; and
- failure to thoroughly review any unexplained discrepancy, whether or not the batch has already been distributed.